• SRVC_01.2 // SCOPE
Specific Support Scope
Adhesive Selection
Provide primary & backup adhesive recommendations based on substrates, stress profile, takt time, with TDS comparison.
Structure Co-Design
Define adhesive bead position, bonding surface geometry, overflow trenches, support ribs, and venting channels.
Process Window
Parameterize dispensing speed / pressure / volume, wet-out time, and UV energy curve to create a stable process window.
Fixture & Curing
Design curing station layout, UV lamp path & access, clamping/locating jigs, and assembly positioning strategy.
Auto Scalability
Ensure early-phase bonding design scales to automation, avoiding 'works manually but fails in mass-production' risks.
Prototype Validation
Support small-batch dispensing & curing trials, parameter tuning, reference samples, and build baseline controls.